The 318 is parked at its usual spot behind McMinn Asphalt |
Heading east across Commerce Street... |
and passing Dal-Tile. No work here today... |
Our crew pauses at Packaging Corporation of America to unlock and remove derails. The storage siding is in the foreground, dock track is to the rear. |
The 318 ties onto today's inbound cars, left on the interchange by CSXT. |
Watching from Ann Street as the crew inspects the cars and performs a brake test |
The crew pulls the inbounds down to the fouling point, then uncouples. |
They grab the two CSXT boxcars off the siding... |
and couple them to the inbounds. |
The FBOX goes to the warehouse; it is set out on the main. |
The CN car goes to the dock. The ELS box is not needed. Both go on the siding for now. |
With the CSXT respot out of the way, the crew can pull the empties from the warehouse spur. |
They couple back to the loads on the main, then spot them at the warehouse. Some jockeying is required to get the car doors lined up with the warehouse doors. |
Still holding on to the empties from the warehouse, the crew goes down to the dock to pull two more empties there. |
Making the joint... |
All the empties are now set out on the interchange for pickup by CSXT. |
Having dropped the empties, the crew returns to the siding. They uncouple the starch car and leave it on the siding, taking the three boxcars with them. |
Now it's a simple move to spot the GT and CN cars at the dock. |
Finally, the crew pulls back with the ELS car (remember it wasn't requested today)... |
and places it back on the siding with the starch hopper. |
The crew shuts down the 318 and climbs off. They'll complete their day at another switching operation across town. |
Tidak ada komentar:
Posting Komentar