| SR NO | CONSTRUCTION ACTIVITY | ASSOCIATED HAZARDS | EFFECT OF HAZARDS | PREVENTIVE MEASURES / RECOMMENDATIONS |
| 1 | Electrical installations and usage | Short Circuiting | Electrocution or fire | Use hand gloves & other PPE |
| Don’t lay wires under carpets , mats or door ways | ||||
| Employ licensed electricians to carry out electrical installation | ||||
| Use one socket for one appliance. | ||||
| Ensure usage of only fully insulated, undamaged wires or cables. | ||||
| Don’t place bare wire ends in a socket | ||||
| Ensure earthing of equipments | ||||
| Do not use damaged cords and avoid temporary connections | ||||
| Provide all connections through ELCB | ||||
| Protect electrical cables / equipments from water and naked flames. | ||||
| Check all connections before energizing. | ||||
| Over loading of Electrical system | Bursting of system leading to fire | Display voltage and current ratings prominently with Danger signs. | ||
| Ensure approved cable size, voltage grade and type | ||||
| Switch of the electrical utilities when not in use. | ||||
| Do not allow unauthorized connections. | ||||
| Ensure proper grid wise distribution of power. | ||||
| Improper laying of overhead under ground transmission lines / cables | Can cause electrocution and prove fatal | Do not lay unamoured cable directly on ground, wall, top of trees. Maintain at least 3 meter distance from HT cables . All temporary cables should be laid at least 750 mm below ground on 100 mm fine sand overlaying by brick soling. | ||
| Proper sleeves should be provided at road crossings. | ||||
| Provide cable route markers indicating the type and depth of cables at intervals not exceeding 30 m and at the diversions termination. | ||||
| 2 | Working at Heights | Person can fall down | May sustain severe injuries or prove fatal | Provide guard rails / barricades at the work place |
| Use PPE like safety belts, full body harness, with two life lines , helmets , safety shoes etc. | ||||
| Obtain work permit before starting the work at height above 2 meters. | ||||
| Fall arrestor systems like safety nets must be installed | ||||
| Provide proper working space ( min 0.6 m x 0.6 m) | ||||
| Tie / weld working platform with fixed support. | ||||
| Avoid moments on beams. | ||||
| May hit the scrap / material stacked at the ground or in between | Keep the work place neat and clean | |||
| Remove the scrap immediately | ||||
| Material can fall down | May hit the workers working at lower levels & prove fatal | Same as above plus | ||
| Barricade the area at ground level | ||||
| Do not throw or drop materials or equipment from height. | ||||
| All tools to be carried in a tool kit bag. | ||||
| Remove scraps from the planks. | ||||
| Ensure wearing of helmet by the workers at low level | ||||
| 3 | Confined Spaces | Suffocation | Unconsciousness / death | Use respiratory devices |
| Avoid over crowding inside a confined space | ||||
| Provide exhaust fans / ventilation | ||||
| Do not use loose clothes. | ||||
| Keep a stand by person outside the vessel | ||||
| Provide alarm bell to the person inside the confined space. | ||||
| Check for reasons of hydro carbons O2 level, toxic gases | ||||
| Obtain permit before entering the confined space | ||||
| All incoming lines to the tank should be emptied and blank | ||||
| Presence of foul smell and toxic substances | Inhalation can pose threat to life | Same as above plus Check for compounds before entering a confined space | ||
| Keep one person outside the confined space for continuing monitoring and for extending help in case of emergency. | ||||
| Ignition / flame can cause fire | Person may sustain burr injuries or explosion may occur | Keep fire extinguishers handy | ||
| Remove surplus material and scrap immediately | ||||
| Do not smoke inside a confined space | ||||
| Do not allow gas cylinders inside a confined space | ||||
| Use low voltage (24 V) explosion proof lamps for lighting | ||||
| Use pneumatic tools or electric tools with max. 24 V (explosion proof) | ||||
| Remove all equipments at the end of the day. | ||||
| 4 | Radiography | Ionizing / radiation from source | Radiation may cause diseases like cancer , skin irritation , dermatitis etc | Follow safety guidelines from BARC before commencement of job. |
| Employ authorized and trained person with requisite qualifications. | ||||
| Barricade the area and install radiation warning symbol. | ||||
| Restrict the entry of unauthorized persons. | ||||
| Wear appropriate PPE and film badges issued by BARC. | ||||
| Transportation and storage of radiography source | Same as above | Never touch or handle radiography source with hands. | ||
| Store radiography source inside approved pit in an exclusive isolated storage room with lock and key arrangement. | ||||
| Radiography source shall never be carried in a passenger bus or an passenger compartment of train. | ||||
| BARC should be informed before source movement. | ||||
| Loss of radioisotope | Same as above | Try to locate with the help of survey meter and inform to BARC | ||
| 5 | Hand Power Tools | Unguarded moving parts like grinding wheels, drill bits. | It may injure the operator. Wheel may get detached,. And hit the passer might by flying missiles causing serious injury. | Use proper guard. Ensure tightening mechanism of the tool. |
| Supply of power without earthing | Electrocution | Always use three pin plug. Ensure good earthing. | ||
| Damage tools | Can cause injury. | Always use tested & verified tools. | ||
| 6 | Lifting Activities. | Failure of load lifting & moving equipment | Can cause accident & proved to be fatal | Check periodically oil, brakes, gears, Horns , and tyre pressure of all moving machinery, Check quality, size & condition of all chained pulley blocks, sleeves, Sling, U clamps, D shackle , wire ropes, etc. Allow crane to move only on hard firm and leveled ground . Allow lifting sling as short as possible. |
| Overloading of Lifting equipments. | Same as above | Safe Lifting capacity of derricks, and winches should be ascertained, Maximum SWL shall marked on all lifting equipments. Check the weight of columns & other heavy items painted on them and accordingly design above the angle of erection. Allow only trained operators and riggers during crane operations. | ||
| Overhead Electrical wires | Can cause electrocution & fire. | Do not allow boom or the other part of the crane to come within the three meter reach of overhead HT cables. | ||
| Hook & load being lifted shall be preferably remained in full visibility. |